Maintenance
Emergency Maintenance
Resolved May 28 at 07:00am BST
MS3 are performing emergency maintenance, to improve the quality and stability our infrastructure in the HU3 area.
Date and time (from and to) of Change:
2024-05-28 0700 - 1500
Description of the work:
Essential maintenance is required to improve the quality of the MS3 network. Customers located in HU3 may experience up to 8 HRS interruption to their service, however we will endeavour to minimise the outage where possible.
Planned Maintenance
Resolved May 23 at 06:00am BST
We will be performing planned maintenance for a 3rd party to install a new mast in your area.
Date and time of Change:
Thursday 23rd May from 06:00 to 08:00
Description of the work:
Diversionary work, to allow a third party to install a new mast.
External Maintenance
Resolved May 21 at 01:00pm BST
MS3 are performing emergency maintenance, to improve the quality and stability our infrastructure in the HU9 area.
Date and time (from and to) of Change:
2024 05 21 1300 - 1700
Description of the work:
Essential maintenance is required to improve the quality of the MS3 network. Customers located in HU9 may experience up to 4 Hours interruption to their service, however we will endeavour to minimise the outage where possible and may complete the improvement activity ahead of schedule.
Emergency Maintenance
Resolved May 17 at 11:45am BST
MS3 are performing emergency maintenance, to improve the quality and stability our infrastructure in the HU6 area.
Date and time (from and to) of Change:
2024-05-17 11:45 - 13:00
Description of the work:
Essential maintenance is required to improve the quality of the MS3 network. Customers located in HU6 may experience up to 1 HOUR 15 MINS interruption to their service, however we will endeavour to minimise the outage where possible.
Emergency Maintenance
Resolved May 16 at 01:15pm BST
MS3 are performing emergency maintenance, to improve the quality and stability our infrastructure in the HU6 area.
Date and time (from and to) of Change:
2024-05-16 1:15 - 2:30
Description of the work:
Essential maintenance is required to improve the quality of the MS3 network.
Expected Impact:
Customers located in HU6 may experience up to 1 HOUR 15 MINS interruption to their service, however we will endeavour to minimise the outage where possible and may complete the i...
Emergency Maintenance
Resolved May 16 at 11:15am BST
MS3 are performing emergency maintenance, to improve the quality and stability our infrastructure in the HU5 area.
Date and time (from and to) of Change:
2024-05-16 11:15 - 12:30
Description of the work:
Essential maintenance is required to improve the quality of the MS3 network. Customers located in HU5 may experience up to 1 HOUR 15 MINS interruption to their service, however we will endeavour to minimise the outage where possible.
Planned Maintenance
Resolved May 15 at 07:00am BST
MS3 are performing maintenance, to improve the quality and stability our infrastructure in the HU5 area.
Date and time (from and to) of Change:
2024-05-15 0700 - 1300
Description of the work:
Essential maintenance is required to improve the quality of the MS3 network.
Expected Impact:
Customers located in HU5 may experience up to 6 HRS interruption to their service, however we will endeavour to minimise the outage where possible and may complete the improvement activity ahead o...
dn17 postcode area, scheduled approx 14hrs downtime 12/05/2024
Resolved May 12 at 06:00am BST
dn17 postcode area, scheduled approx. 14hrs downtime, Sunday 12/05/2024
Emergency Maintenance
Resolved May 11 at 06:00am BST
CAB strike impacting SCN.
A plan has been drafted to permanently restore power and network services for customers:
Due to the damage that our CAB has sustained in the accident, we are required to build and install a brand-new CAB and power feed. The plan requires complex activity and co-ordination, with multiple internal teams and external contractors working in partnership. We will implement the service impacting element of our plan at 06:00 on Saturday 11th May, which will incur up to ...
Emergency Maintenance
Resolved May 08 at 10:00am BST
MS3 are performing emergency maintenance, to improve the quality and stability our infrastructure in the HU9 area.
Date and time (from and to) of Change:
08/05/24 FROM 10:00 TO 14:00
Description of the work:
Essential maintenance is required to improve the quality of the MS3 network.
Expected Impact:
Customers located in HU9 may experience up to 4HRS interruption to their service, however we will endeavour to minimise the outage where possible and may complete the improvement a...
Emergency Maintenance
Resolved May 02 at 09:30am BST
MS3 are performing emergency maintenance, to improve the quality and stability our infrastructure in the HU4 area.
Date and time (from and to) of Change:
02/05/24 FROM 09:30 TO 12:30
Description of the work:
Essential maintenance is required to improve the quality of the MS3 network.
Expected Impact:
Customers located in HU4 may experience up to 3HRS interruption to their service, however we will endeavour to minimise the outage where possible and may complete the improvement ac...
Emergency Maintenance
Resolved May 01 at 01:30pm BST
MS3 are performing emergency maintenance, to improve the quality and stability our infrastructure in the HU3 area.
Date and time (from and to) of Change:
2023-05-01 13:30 - 16:30
Expected Impact:
Customers located in HU3 may experience up to 3 hours interruption to their service, however we will endeavour to minimise the outage where possible.
Emergency Maintenance
Resolved May 01 at 09:45am BST
MS3 are performing emergency maintenance, to improve the quality and stability our infrastructure in the HU6 area.
Date and time (from and to) of Change:
9:45 - 10:45 2024-05-01
Description of the work:
Essential maintenance is required to improve the quality of the MS3 network.
Expected Impact:
Customers located in HU6 may experience up to 1 HOUR interruption to their service, however we will endeavour to minimise the outage where possible and may complete the improv...
Emergency Maintenance
Resolved Jun 28 at 09:35am BST
Dear Customer,
MS3 are performing emergency maintenance, to improve the quality and stability our infrastructure.
Date and time (from and to) of Change:
28 06 2024 0935 - 1235
Description of the work:
Essential maintenance is required to improve the quality of the MS3 network.
Expected Impact:
Customers may experience up to 3 HRS interruption to their service, however we will endeavour to minimise the outage where possible and may complete the improvement activity ahead of s...
Planned Maintenance
Resolved Jun 28 at 09:00am BST
MS3 are performing planned maintenance activity on Friday 28th June.
Date and time of Change:
Friday 28th June from 09:00 until 17:00
Description of the work:
New carrier pole installed, 3 new spans to existing customers, taking cable to the CTU, and cut old cable off and splice new cable, recommissioning required by NOC while Ops remove old equipment.
Expected Impact:
Customer impact expected later in the day, ETA 15:00 for not more than an hour (time it takes for recommission t...
Emergency Maintenance
Resolved Jun 27 at 11:05am BST
MS3 are performing emergency maintenance, to improve the quality and stability our infrastructure.
Date and time (from and to) of Change:
27 06 2024 11:05 - 14:10
Description of the work:
Essential maintenance is required to improve the quality of the MS3 network.
Expected Impact:
Customers may experience up to 3 HRS interruption to their service, however we will endeavour to minimise the outage where possible and may complete the improvement activity ahead of schedule.
Thank ...
Emergency Maintenance
Resolved Jun 26 at 09:00am BST
MS3 are performing emergency maintenance, to improve the quality and stability our infrastructure.
Date and time (from and to) of Change:
0900 - 1200
Description of the work:
Essential maintenance is required to improve the quality of the MS3 network.
Expected Impact:
Customers may experience up to 3 HRS* interruption to their service, however we will endeavour to minimise the outage where possible and may complete the improvement activity ahead of schedule.
Thank you for y...
Emergency Maintenance
Resolved Jun 25 at 02:30pm BST
MS3 are performing emergency maintenance, to improve the quality and stability our infrastructure.
Date and time (from and to) of Change:
25 06 2024 1430 - 16:30
Description of the work:
Essential maintenance is required to improve the quality of the MS3 network.
Expected Impact:
Customers experience up to 2 HRS interruption to their service, however we will endeavour to minimise the outage where possible and may complete the improvement activity ahead of schedule.
Thank y...
Emergency Maintenance
Resolved Jun 25 at 02:20pm BST
MS3 are performing emergency maintenance, to improve the quality and stability our infrastructure.
Date and time (from and to) of Change:
2024-06-25 14:20 - 15:20
Description of the work:
Essential maintenance is required to improve the quality of the MS3 network.
Expected Impact:
Customers may experience up to 1 HOUR interruption to their service, however we will endeavour to minimise the outage where possible and may complete the improvement activity ahead of schedule.
...
Emergency Maintenance
Resolved Jun 25 at 01:00pm BST
MS3 are performing emergency maintenance, to improve the quality and stability our infrastructure.
Date and time (from and to) of Change:
2024-06-25 13:00-14:00
Description of the work:
Essential maintenance is required to improve the quality of the MS3 network.
Expected Impact:
Customers may experience up to 1 HOUR interruption to their service, however we will endeavour to minimise the outage where possible and may complete the improvement activity ahead of schedule.
Emergency Maintenance
Resolved Jun 25 at 11:50am BST
MS3 are performing emergency maintenance, to improve the quality and stability our infrastructure.
Date and time (from and to) of Change:
25 06 2024 1150 - 1450
Description of the work:
Essential maintenance is required to improve the quality of the MS3 network.
Expected Impact:
Customers may experience up to 3 HRS interruption to their service, however we will endeavour to minimise the outage where possible and may complete the improvement activity ahead of schedule.
Thank...
Emergency Maintenance
Resolved Jun 25 at 11:10am BST
MS3 are performing emergency maintenance, to improve the quality and stability our infrastructure.
Date and time (from and to) of Change:
25/06/24 FROM 11:10 TO 13:10
Description of the work:
Essential maintenance is required to improve the quality of the MS3 network.
Expected Impact:
Customers may experience up to 2HRS interruption to their service, however we will endeavour to minimise the outage where possible and may complete the improvement activity ahead of schedule.
...
Emergency Maintenance
Resolved Jun 24 at 01:35pm BST
MS3 are performing emergency maintenance, to improve the quality and stability our infrastructure.
Date and time (from and to) of Change:
24 06 2024 - 1335 - 1535
Description of the work:
Essential maintenance is required to improve the quality of the MS3 network.
Expected Impact:
Customers may experience up to 2 HRS interruption to their service, however we will endeavour to minimise the outage where possible and may complete the improvement activity ahead of schedule.
Tha...
Emergency Maintenance
Resolved Jun 24 at 12:05pm BST
MS3 are performing emergency maintenance, to improve the quality and stability our infrastructure.
Date and time (from and to) of Change:
24 06 2024 1205 - 1405
Description of the work:
Essential maintenance is required to improve the quality of the MS3 network.
Expected Impact:
Customers may experience up to 2 HRS interruption to their service, however we will endeavour to minimise the outage where possible and may complete the improvement activity ahead of schedule.
Than...
Planned Maintenance
Resolved Jun 22 at 08:00am BST
MS3 are performing planned maintenance to a number of poles in your area, following malicious damage to equipment in the area.
Date and time (from and to) of Change:
From 08:00 until 18:00 on 21st June and from 08:00 until 18:00 on 22nd June
Description of the work:
Engineers will be repositioning pole cables. Customers located in HU9 may experience interruption to their service, we do not foresee any interruptions however due to the nature of the work there may be unexpected interru...
Emergency Maintenance
Resolved Jun 21 at 04:40pm BST
MS3 are performing emergency maintenance, to improve the quality and stability our infrastructure in the HU13 area.
Date and time (from and to) of Change:
21 06 2024 1640 - 1840
Description of the work:
Essential maintenance is required to improve the quality of the MS3 network. Customers located in HU13 may experience up to 2 HOURS interruption to their service, however we will endeavour to minimise the outage where possible and may complete the improvement activity ahead of schedule.
Emergency Maintenance
Resolved Jun 21 at 02:55pm BST
MS3 are performing emergency maintenance, to improve the quality and stability our infrastructure in the HU5 area.
Date and time (from and to) of Change:
21 06 2024 1455 - 1655
Description of the work:
Essential maintenance is required to improve the quality of the MS3 network. Customers located in HU5 may experience up to 2 HRS interruption to their service, however we will endeavour to minimise the outage where possible and may complete the improvement activity ahead of schedule.
Emergency Maintenance
Resolved Jun 21 at 02:40pm BST
MS3 are performing emergency maintenance, to improve the quality and stability our infrastructure in the HU9 area.
Date and time (from and to) of Change:
2024-06-21 14:40 - 18:30
Description of the work:
Feed cable to multiple FATs has snapped and needs replacing. Customers located in HU9 may experience up to 3 HOURS 50 MINS interruption to their service, however we will endeavour to minimise the outage where possible and may complete the improvement activity ahead of sche...
Planned Maintenance
Resolved Jun 21 at 08:00am BST
MS3 are performing planned maintenance to a number of poles in your area, following malicious damage to equipment in the area.
Date and time (from and to) of Change:
From 08:00 until 18:00 on 21st June and from 08:00 until 18:00 on 22nd June
Description of the work:
Engineers will be repositioning pole cables. Customers located in HU9 may experience interruption to their service, we do not foresee any interruptions however due to the nature of the work there may be unexpected interru...
Emergency Maintenance
Resolved Jun 20 at 03:55pm BST
MS3 are performing emergency maintenance, to improve the quality and stability our infrastructure in the HU6 area.
Date and time (from and to) of Change:
20 06 2024 15:55 - 17:55
Description of the work:
Essential maintenance is required to improve the quality of the MS3 network. Customers located in HU6 may experience up to 2 HOURS interruption to their service, however we will endeavour to minimise the outage where possible and may complete the improvement activity ahead of sched...
Emergency Maintenance
Resolved Jun 20 at 02:45pm BST
MS3 are performing emergency maintenance, to improve the quality and stability our infrastructure in the HU5 area.
Date and time (from and to) of Change:
20 06 2024 14:45 - 17:45
Description of the work:
Essential maintenance is required to improve the quality of the MS3 network. Customers located in HU5 may experience up to 3 HOURS interruption to their service, however we will endeavour to minimise the outage where possible and may complete the improvement activity ahead of schedule.
Emergency Maintenance
Resolved Jun 20 at 02:40pm BST
MS3 are performing emergency maintenance, to improve the quality and stability our infrastructure in the HU5 area.
Date and time (from and to) of Change:
20 06 2024 - 14:40-15:40
Description of the work:
Essential maintenance is required to improve the quality of the MS3 network. Customers located in HU5 may experience up to 1 HOUR interruption to their service, however we will endeavour to minimise the outage where possible and may complete the improvement activity ahead of schedule.
Emergency Maintenance
Resolved Jun 20 at 11:45am BST
MS3 are performing emergency maintenance, to improve the quality and stability our infrastructure in the HU5.
Date and time (from and to) of Change:
20 06 2024 - 11:45 - 13:45
Description of the work:
Essential maintenance is required to improve the quality of the MS3 network. Customers located in HU5 may experience up to 2 HOURS interruption to their service, however we will endeavour to minimise the outage where possible and may complete the improvement activity ahead of schedule.
Emergency Maintenance
Resolved Jun 20 at 12:00am BST
As part of MS3 on-going network improvements we are implementing a change to amend the path of our core traffic following the installation of a new 100G capacity link.
Date and time of Change:
Thursday 20th June at 00:00 until 02:00
Description of the work:
Core Network configuration change. There is no expected impact to services.
Emergency Maintenance
Resolved Jun 19 at 02:50pm BST
MS3 are performing emergency maintenance, to improve the quality and stability our infrastructure.
Date and time (from and to) of Change:
19 06 2024
1450 - 1650
Description of the work:
Essential maintenance is required to improve the quality of the MS3 network.
Expected Impact:
Customers may experience up to 2 hours interruption to their service, however we will endeavour to minimise the outage where possible and may complete the improvement activity ahead of schedule.
Emergency Maintenance
Resolved Jun 19 at 01:15pm BST
MS3 are performing emergency maintenance, to improve the quality and stability our infrastructure.
Date and time (from and to) of Change:
19 06 2024
1315 - 1615
Description of the work:
Essential maintenance is required to improve the quality of the MS3 network.
Expected Impact:
Customers located in may experience up to 3 HRS interruption to their service, however we will endeavour to minimise the outage where possible and may complete the improvement activity ahead of sche...
Emergency Maintenance
Resolved Jun 19 at 11:30am BST
MS3 are performing emergency maintenance, to improve the quality and stability our infrastructure.
Date and time (from and to) of Change:
19/06/2024
1130 - 1430
Description of the work:
Essential maintenance is required to improve the quality of the MS3 network.
Expected Impact:
Customers may experience up to 3 HRS interruption to their service, however we will endeavour to minimise the outage where possible and may complete the improvement activity ahead of schedule.
Emergency Maintenance
Resolved Jun 19 at 10:00am BST
MS3 are performing emergency maintenance, to improve the quality and stability our infrastructure.
Date and time (from and to) of Change:
19/06/2024
1000 - 1200
Description of the work:
Essential maintenance is required to improve the quality of the MS3 network.
Expected Impact:
Customers may experience up to 2 HOURS interruption to their service, however we will endeavour to minimise the outage where possible and may complete the improvement activity ahead of schedule.
Emergency Maintenance
Resolved Jun 14 at 10:30am BST
MS3 are performing emergency maintenance, to improve the quality and stability our infrastructure.
Date and time (from and to) of Change:
2024-06-14 10:30 - 12:00
Description of the work:
Essential maintenance is required to improve the quality of the MS3 network.
Expected Impact:
Customers may experience up to 1 HOUR 30 MINS interruption to their service, however we will endeavour to minimise the outage where possible and may complete the improvement activity ahead of schedul...
Emergency Maintenance
Resolved Jun 11 at 04:00pm BST
MS3 are performing emergency maintenance, to improve the quality and stability our infrastructure in the HU5 area.
Date and time (from and to) of Change:
16:00-17:00 11/06/2024
Description of the work:
Essential maintenance is required to improve the quality of the MS3 network. Customers located in HU5 may experience up to 1 HOUR interruption to their service, however we will endeavour to minimise the outage where possible and may complete the improvement activity ahead of schedule.
Emergency Maintenance
Resolved Jun 11 at 12:45pm BST
MS3 are performing emergency maintenance, to improve the quality and stability our infrastructure.
Date and time (from and to) of Change:
11/06/24 FROM 12:45 TO 15:45
Description of the work:
Essential maintenance is required to improve the quality of the MS3 network.
Expected Impact:
Customers may experience up to 3HRS interruption to their service, however we will endeavour to minimise the outage where possible and may complete the improvement activity ahead of schedule.
Emergency Maintenance
Resolved Jun 10 at 03:30pm BST
MS3 are performing emergency maintenance, to improve the quality and stability our infrastructure.
Date and time (from and to) of Change:
15:30 - 16:30 10/05/2024
Description of the work:
Essential maintenance is required to improve the quality of the MS3 network.
Expected Impact:
Customers may experience up to 1 HOUR interruption to their service, however we will endeavour to minimise the outage where possible and may complete the improvement activity ahead of schedule.
Emergency Maintenance
Resolved Jun 10 at 02:30pm BST
MS3 are performing emergency maintenance, to improve the quality and stability our infrastructure in the HU5 area.
Date and time (from and to) of Change:
14:30 - 15:30
Description of the work:
Essential maintenance is required to improve the quality of the MS3 network. Customers located in HU5 may experience up to 1 HOUR interruption to their service, however we will endeavour to minimise the outage where possible and may complete the improvement activity ahead of schedule.
Emergency Maintenance
Resolved Jun 06 at 12:01am BST
Following several brief outages experienced on our Virgin Media (VM) circuit, VM have recommended a full end to end test of the circuit and equipment. VM will perform diagnostics to help resolve the repeat outages we have encountered.
Date and time of Change:
Thursday 6th June from 00:01 until 06:00
Description of the work:
Full end to end testing and swapping of SFPs at x2 locations during change window, monitor for errors. There will be reduced resiliency on the MS3 network, and som...
Emergency Maintenance
Resolved Jun 04 at 09:00pm BST
MS3 have been advised by our 3rd party that they will be performing emergency maintenance this evening.
Date and time of Change:
Tuesday 4th June from 21:00 until 05:00 on Wednesday 5th June.
Description of the work:
Network Infrastructure maintenance on an existing joint. It is not expected that this work will cause any disruption, however we want to provide notification of risk on our network.
Emergency Maintenance
Resolved Jul 23 at 02:55pm BST
MS3 are performing emergency maintenance, to improve the quality and stability our infrastructure.
Date and time (from and to) of Change:
23/07/24 FROM 14:55 TO 17:55
Description of the work:
Essential maintenance is required to improve the quality of the MS3 network.
Expected Impact:
Customers may experience up to 3HRS interruption to their service, however we will endeavour to minimise the outage where possible and may complete the improvement activity ahead of schedule.
Emergency Maintenance
Resolved Jul 23 at 09:00am BST
MS3 are performing emergency maintenance, to improve the quality and stability our infrastructure in the HU10 area.
Date and time (from and to) of Change:
23/07/24 FROM 09:00 TO 13:00
Description of the work:
Essential maintenance is required to improve the quality of the MS3 network. Customers located in HU10 may experience up to 4HRS interruption to their service, however we will endeavour to minimise the outage where possible and may complete the improvement activity ahead of schedule.
Emergency Maintenance
Resolved Jul 22 at 04:55pm BST
MS3 are performing emergency maintenance, to improve the quality and stability our infrastructure in the HU4 area.
Date and time (from and to) of Change:
22/07/24 FROM 16:55 TO 18:55
Description of the work:
Essential maintenance is required to improve the quality of the MS3 network. Customers located in HU4 may experience up to 2HRS interruption to their service, however we will endeavour to minimise the outage where possible and may complete the improvement activity ahead of schedule.
Emergency Maintenance
Resolved Jul 22 at 04:10pm BST
MS3 are performing emergency maintenance, to improve the quality and stability our infrastructure.
Date and time (from and to) of Change:
22/07/24 FROM 16:10 TO 18:10
Description of the work:
Essential maintenance is required to improve the quality of the MS3 network.
Expected Impact:
Customers may experience up to 2HRS interruption to their service, however we will endeavour to minimise the outage where possible and may complete the improvement activity ahead of schedule.
Emergency Maintenance
Resolved Jul 22 at 03:35pm BST
MS3 are performing emergency maintenance, to improve the quality and stability our infrastructure.
Date and time (from and to) of Change:
2024-07-22 15:35 - 17:35
Description of the work:
Essential maintenance is required to improve the quality of the MS3 network.
Expected Impact:
Customers may experience up to 2 HOURS interruption to their service, however we will endeavour to minimise the outage where possible and may complete the improvement activity ahead of schedule.
Emergency Maintenance
Resolved Jul 18 at 03:50pm BST
MS3 are performing emergency maintenance, to improve the quality and stability our infrastructure.
Description of the work:
Essential maintenance is required to improve the quality of the MS3 network.
Expected Impact:
Customers may experience up to 2HRS interruption to their service, however we will endeavour to minimise the outage where possible and may complete the improvement activity ahead of schedule.
Emergency Maintenance
Resolved Jul 18 at 12:50pm BST
MS3 are performing emergency maintenance, to improve the quality and stability our infrastructure in the HU13 area.
Date and time (from and to) of Change:
18/07/2024 12:50 - 15:50
Description of the work:
Essential maintenance is required to improve the quality of the MS3 network. Customers located in HU13 may experience up to 3 HRS interruption to their service, however we will endeavour to minimise the outage where possible and may complete the improvement activity ahead of schedule.
Emergency Maintenance
Resolved Jul 17 at 10:35am BST
MS3 are performing emergency maintenance, to improve the quality and stability our infrastructure.
Description of the work:
Essential maintenance is required to improve the quality of the MS3 network.
Expected Impact:
Customers may experience up to 3 HRS interruption to their service, however we will endeavour to minimise the outage where possible and may complete the improvement activity ahead of schedule.
Thank you for your support.
Emergency Maintenance
Resolved Jul 16 at 09:30am BST
MS3 are performing emergency maintenance, to improve the quality and stability our infrastructure in the HU4 area.
Date and time (from and to) of Change:
16/07/24 FROM 09:30 TO 12:30
Description of the work:
Essential maintenance is required to improve the quality of the MS3 network. Customers located in HU4 may experience up to 3HRS interruption to their service, however we will endeavour to minimise the outage where possible and may complete the improvement activity ahead of schedule.
Emergency Maintenance
Resolved Jul 12 at 02:45pm BST
MS3 are performing emergency maintenance, to improve the quality and stability our infrastructure in the HU5 area.
Date and time (from and to) of Change:
12/07/24 FROM 14:45 TO 17:45
Description of the work:
Essential maintenance is required to improve the quality of the MS3 network. Customers located in HU5 may experience up to 3HRS interruption to their service, however we will endeavour to minimise the outage where possible and may complete the improvement activity ahead of schedule.
Emergency Maintenance
Resolved Jul 09 at 11:35am BST
MS3 are performing emergency maintenance, to improve the quality and stability our infrastructure in the HU5 area.
Date and time (from and to) of Change:
09/07/2024 11:35 - 14:35
Description of the work:
Essential maintenance is required to improve the quality of the MS3 network. Customers located in HU5 may experience up to 4 HRS interruption to their service, however we will endeavour to minimise the outage where possible and may complete the improvement activity ahead of schedule.
Emergency Maintenance
Resolved Jul 08 at 02:00pm BST
MS3 are performing emergency maintenance, to improve the quality and stability our infrastructure.
Date and time (from and to) of Change:
08/0702024 1400 - 1700
Description of the work:
Essential maintenance is required to improve the quality of the MS3 network.
Expected Impact:
Customers may experience up to 3 HRS interruption to their service, however we will endeavour to minimise the outage where possible and may complete the improvement activity ahead of schedule.
Thank you for yo...
Emergency Maintenance
Resolved Jul 05 at 03:25pm BST
MS3 are performing emergency maintenance, to improve the quality and stability our infrastructure .
Date and time (from and to) of Change:
05/07/24 FROM 15:25 TO 18:25
Description of the work:
Essential maintenance is required to improve the quality of the MS3 network.
Expected Impact:
Customers may experience up to 3HRS interruption to their service, however we will endeavour to minimise the outage where possible and may complete the improvement activity ahead of schedule.
Thank you for...
Emergency Maintenance
Resolved Jul 04 at 03:45pm BST
MS3 are performing emergency maintenance, to improve the quality and stability our infrastructure in the HU6 area.
Date and time (from and to) of Change:
2024-07-04 15:45 - 17:00
Expected Impact:
Essential maintenance is required to improve the quality of the MS3 network. Customers located in HU6 9NT may experience up to 1 HOUR 15 MINS interruption to their service, however we will endeavour to minimise the outage where possible and may complete the improvement activity ahead of sc...
Emergency Maintenance
Resolved Jul 03 at 09:30am BST
MS3 are performing emergency maintenance, to improve the quality and stability our infrastructure.
Date and time (from and to) of Change:
03 07 2024 0930 - 1130
Description of the work:
Essential maintenance is required to improve the quality of the MS3 network.
Expected Impact:
Customers may experience up to 2 HRS interruption to their service, however we will endeavour to minimise the outage where possible and may complete the improvement activity ahead of schedule.
Emergency Maintenance
Resolved Jul 02 at 09:30am BST
MS3 are performing emergency maintenance on Tuesday 2nd July at 09:30 until 10:30, this is not expected to impact any customers, MS3 are sharing for information only.
Date and time of Change:
Tuesday 2nd July 2024 from 09:30 until 10:30.
Description of the work:
A new UPS will be installed into CAB HUL109.
Expected Impact:
No impact is expected